Darb designs and builds clinics across Riyadh — general practice, dental, aesthetic, and specialty. MOH-compliant finishes, medical MEP (gas, waste, water quality), and the infection-control detail that makes the difference between an inspection pass and a re-visit. Reception, consultation rooms, and treatment bays that read as a serious clinic — not a converted office.
MOH regulations apply across all three, but the treatment rooms and MEP layer are what differ.
Multi-specialty family clinics — reception, waiting, consultation rooms, minor treatment bay, and a pharmacy or lab if the license permits. Standard MOH compliance, calm interior tone.
Full dental practice fit-out — reception, consultation, treatment chairs (chairs + suction + compressor MEP), sterilisation room, X-ray room with lead shielding, and orthodontic / cosmetic sub-specialties.
Aesthetic and cosmetic clinics — dermatology, laser, cosmetic surgery consultation, IV drip lounges. Finish spec closer to hospitality than medical, but still fully MOH-compliant.
Concept to MOH inspection — design, drawings, permits, medical MEP, infection-control finishes, and inspection handover.
Every engagement is scoped to the specialty, the licence tier, and the target opening date — proposals return within 48 hours of the site brief.
The full turn-key engagement — concept, MOH-compliant drawings, permits, medical MEP, build, inspection handover.
For clinic operators with a medical-planning consultant already engaged — we validate the package and deliver.
For clinic networks opening multiple branches — standardised design + MEP package, MOH-compliant across every branch, rolling handovers.
Every engagement is fully customised — send the specialty, the licence tier, and the target opening date; a tailored proposal returns within 48 hours.
Clinic lead time is heavier than office because MOH compliance + medical MEP + inspection cycles add weeks. Dental and aesthetic clinics run longer than general practice because of the equipment MEP and lead-shielding requirements.
We visit the space, take measurements, and review your MOH licence tier + intended specialties. Rough budget bracket returned within 48 hours.
Concept + 3D + full construction drawings, all MOH-compliant from the first submission. Room sizing, patient-flow, sterilisation loop, and medical MEP all designed to code — not corrected after inspection.
MOH + civil defence + municipality permits filed. Site build starts as soon as clearances land — medical MEP first, then partitions, ceilings, floors (seamless), finishes, equipment install.
MOH inspection handled by us, punch-list clearance if any, handover on the target date. Support during the licence-activation window so you can start seeing patients on day one.
Yes, part of every clinic engagement. Full MOH-compliant design from the first submission, permit filing, and inspection handover. Our clinic builds pass MOH inspection on the first visit as standard — we build to code, not to a moodboard corrected after inspection.
10-14 weeks typical. General practice sits at the bottom of the range; dental clinics with X-ray rooms sit at the top because of lead-shielding and dental-unit MEP. Multi-specialty clinics with lab or pharmacy add 1-2 weeks per additional licensed room.
Standard scope. Dental chair install (or coordinated with your supplier), full dental-unit MEP (suction, compressor, gas), X-ray room with lead-lined walls + door + viewing panel per SFDA-radiation-safety spec, and MOH-protocol sterilisation room with clean/dirty flow.
All in scope for design-and-build engagements. Medical gas piping (oxygen, medical air, N2O for dental) to each treatment point, RO water for sterilisation and specific procedures, and MOH-compliant medical-waste segregation with a proper collection room and pickup access.
Yes — seamless flooring (welded vinyl or epoxy) with integral coved skirting to eliminate corners, antimicrobial paint on walls, wipe-down door hardware, and any HEPA filtration for clean-room-designated areas. Infection-control finish detail is the difference between an inspection pass and a re-visit.
That's the norm for high-end aesthetic. Reception and consultation-room finishes closer to a boutique hotel than a traditional clinic — engineered wood, natural stone, ambient lighting — while treatment rooms stay fully MOH-compliant with the infection-control detail. The two layers coexist by design, not by compromise.
We hold the drawing coordination — your equipment supplier (dental units, imaging, laser, chairs) shares equipment spec sheets, we integrate them into the MEP and structural drawings, and we schedule equipment install into the build sequence. Client keeps the equipment purchase decision; we run the coordination.
Yes — VAT-registered invoicing with 15% VAT applied, corporate PO handling, and payment terms that fit a clinic-opening calendar (typically 20/30/30/20 across signature / drawings sign-off / mid-build / handover, with the last tranche after MOH inspection sign-off).
Send the specialty, the licence tier, and your target opening date. A tailored proposal — MOH-compliant concept, MEP scope, budget bracket, timeline — returns within 48 hours.